Atigun Pass
- The scope for this project was to provide 112 man camp to be located in Atigun pass. From start to finish, the time frame was two and a half months that included programming, design, permitting, manufacturing, procurement, equipment, transportation, assemblage, financing, funding, commissioning, incinerator, prime and back up generator system. Delta Leasing, LLC and our team met this deadline and provided a quality product. The project was completed on time and under budget.
- Completed 2008
BP Tarmac Camp
- Delta Leasing, LLC entered into an agreement to provide a 212 man camp for BP Exploration. The scope also included a kitchen dining facility for 400 people, a waste water facility, and a generator for temporary power. This was a very successful project for several reasons. BP made a strong commitment to the success by providing excellent project managers here in Anchorage and on the slope that tracked the project and communicated with us on a weekly basis.
Kensington Mine Dormatories